Docket Number M-2015-2514767

Docket Number M-2015-2514767 Status Closed
Applicant METROPOLITAN EDISON COMPANY Utility Code 110300
Complainant Utility Name METROPOLITAN EDISON CO.
Respondent Utility Type Electric
Responsible Bureau TUS eFiling Confirmation Number
Date Filed 11/23/2015 Date Posted 11/25/2015
Case Description Metropolitan Edison Company filed Petition for Approval of its Act 129 Phase III Energy Efficiency and Conservation Plan.
Action Date Description Date Posted
7/24/2023 Case Closed - No Active Tasks Exist for this Case - Case Closed as no Active Tasks exists for this Case 7/24/2023
9/30/2022 Document Published on Web - Document 'PY 13 Final Semi - Annual Rpt - Met-Ed Etc' is made public 9/30/2022
9/30/2022 Document Attached to Case - PY 13 Final Semi - Annual Rpt - Met-Ed Etc - Met-Ed, Penelec, Etc., Program Year 13 Final Semi - Annual Report. 9/30/2022
4/11/2022 Document Attached to Case - PY 12 2nd Amended Final Annual Rpt - Met-Ed Etc - Met-Ed, Penelec, Etc., filed Program Year 12 2nd Amended Final Annual Report 4/11/2022
4/11/2022 Document Published on Web - Document 'PY 12 2nd Amended Final Annual Rpt - Met-Ed Etc' is made public 4/11/2022
4/5/2022 Document Published on Web - Document 'PY 12 Amended Final Annual Rpt - Met-Ed Etc' is made public 4/5/2022
4/5/2022 Document Attached to Case - PY 12 Amended Final Annual Rpt - Met-Ed Etc - Met-Ed, etc., filed Program Year 12 Amended Final Annual Report 4/5/2022
11/17/2021 Document Published on Web - Document 'PY12 FINAL Annual Report - Met Ed, Penelec, Penn Power, WPP' is made public 11/17/2021
11/17/2021 Document Attached to Case - PY12 FINAL Annual Report - Met Ed, Penelec, Penn Power, WPP - Met Ed, Penelec, Penn Power and West Penn Power filed Program Year 12 Final Annual Report. 11/17/2021
7/16/2021 Document Published on Web - Document 'Q2 PY12 Semi Annual Report - Met Ed, Penelec, Penn Power, West Penn Power' is made public 7/16/2021
7/16/2021 Document Attached to Case - Q2 PY12 Semi Annual Report - Met Ed, Penelec, Penn Power, West Penn Power - Met Ed, Penelec, Penn Power and West Penn Power filed semi annual report for second quarter of program year 12. 7/16/2021
3/15/2021 Document Published on Web - Document 'Semi Annual Report - PY12 - Met Ed, Penelec, Penn Power, West Penn Power' is made public 3/15/2021
3/15/2021 Document Attached to Case - Semi Annual Report - PY12 - Met Ed, Penelec, Penn Power, West Penn Power - Met Ed, Penelec, Penn Power and West Penn Power filed program year 12 semi-annual report. 3/15/2021
3/9/2021 Document Published on Web - Document 'PY11 Annual Report 1 Feb 12 2021' is made public 3/9/2021
3/9/2021 Document Published on Web - Document 'Cover Ltr Re Final Annual Rpt Phase III PY 11 (6/1/19-5/31/2020) - Met-Ed Et al' is made public 3/9/2021
3/9/2021 Document Attached to Case - Cover Ltr Re Final Annual Rpt Phase III PY 11 (6/1/19-5/31/2020) - Met-Ed Et al - Met-Ed Et al filed Cover Letter Re Final Annual Report Phase III Program Year 11 (6/1/19-5/31/2020) 3/9/2021
8/4/2020 Document Attached to Case - Conservation Service Provider Contract w/ CLEAResult Consulting Inc (Confidential) - Met Ed, Penelec, Penn Power, West Penn Power 8/4/2020
7/31/2020 Assigned Responsible Bureau - TUS 7/31/2020
7/30/2020 Case ReOpened - ReOpened - TUS 7/30/2020
7/30/2020 Assigned Responsible Bureau - TUS 7/30/2020
7/23/2020 Document Published on Web - Document 'Semi-Annual Report PY11 - Met Ed, PENELEC, Penn Power, West Penn Power' is made public 7/23/2020
7/23/2020 Document Attached to Case - Semi-Annual Report PY11 - Met Ed, PENELEC, Penn Power, West Penn Power - Met Ed, PENELEC, Penn Power and West Penn Power Company filed semi-annual report for program year 11. 7/23/2020
1/21/2020 Document Published on Web - Document 'Met Ed Act 129 Phase III Semi-Annual PY11' is made public 1/21/2020
1/21/2020 Document Attached to Case - Met Ed Act 129 Phase III Semi-Annual PY11 - Metropolitan Edison Company filed Semi-Annual Act 129 Report, Phase III, Program Year 11. 1/21/2020
12/16/2019 Case Closed - No active tasks exist for this Case 12/16/2019
12/3/2019 Document Published on Web - Document 'Met Ed Penelec Penn Pwr WPP Phase III PY 10 EE&C Final Annual Report' is made public 12/3/2019
12/3/2019 Document Attached to Case - Met Ed Penelec Penn Pwr WPP Phase III PY 10 EE&C Final Annual Report - Metropolitan Edison Company, Pennsylvania Electric Company, Pennsylvania Power Company, and West Penn Power Company filed Phase III Program Year 10 Energy Efficiency and Conservation Program Final Annual Report. 12/3/2019
7/22/2019 Document Published on Web - Document 'Cover Letter to MetEd Phase III PY 10 Semi-Annual Report' is made public 7/22/2019
7/22/2019 Document Published on Web - Document 'MetEd Phase III PY 10 Semi-Annual Report' is made public 7/22/2019
7/22/2019 Document Attached to Case - Cover Letter to MetEd Phase III PY 10 Semi-Annual Report - Metropolitan Edison Company filed Act 129 Phase III Program Year 10 Semi-Annual Report. 7/22/2019
3/28/2019 Document Published on Web - Document 'Cover Letter of CSP Contract Change for Oracle America Inc Re the Residential Behavioral - Demand Response (Call Center Services) Program-Met-Ed' is made public 3/29/2019
3/28/2019 Document Attached to Case - CSP Contract Change for Oracle America Inc Re the Residential Behavioral - Demand Response (Call Center Services) Program-CONFIDENTIAL-Met-Ed - Metropolitian Edison Co filed CSP Contract Change for Oracle America Inc Re the Residential Behavioral - Demand Response (Call Center Services) Program 3/29/2019
3/28/2019 Document Attached to Case - Cover Letter of CSP Contract Change for Oracle America Inc Re the Residential Behavioral - Demand Response (Call Center Services) Program-Met-Ed - Metropolitian Edison Co filed CSP Contract Change for Oracle America Inc Re the Residential Behavioral - Demand Response (Call Center Services) Program 3/29/2019
3/28/2019 Document Published on Web - Document 'Cover Letter Re CSP Contract Change Re for the Residential Behavioral - Demand Response Program-with Oracle America Inc-Met-Ed' is made public 3/29/2019
3/28/2019 Document Attached to Case - CSP Contract with Oracle America Inc-CONFIDENTIAL-Met-Ed - Metropolitan Edison Co filed CSP Contract with Oracle America Inc 3/29/2019
3/28/2019 Document Attached to Case - Cover Letter Re CSP Contract with Oracle America Inc-Met-Ed - Metropolitan Edison Co filed CSP Contract with Oracle America Inc 3/29/2019
1/18/2019 Document Published on Web - Document 'Cover Letter Re Semi-Annual Report Phase III Program Period 6/1/18 to 11/30/18-Metropolitan Edison Co' is made public 1/18/2019
1/18/2019 Document Published on Web - Document 'FE Semi-Annual Report PY10-1' is made public 1/18/2019
1/18/2019 Document Published on Web - Document 'Cover Letter Re Semi-Annual Report Phase III Program Period 6/1/18 to 11/30/18-Metropolitan Edison Co' is made public 1/18/2019
1/18/2019 Document Published on Web - Document 'FE Semi-Annual Report PY10-1' is made public 1/18/2019
1/18/2019 Document Attached to Case - Cover Letter Re Semi-Annual Report Phase III Program Period 6/1/18 to 11/30/18-Metropolitan Edison Co - Metropolitan Edison Co filed Cover Letter Re Semi-Annual Report Phase III Program Period 6/1/18 to 11/30/18 1/18/2019
1/10/2019 Document Attached to Case - CSP Contract with Energy Connect - Met Ed - Metropolitan Edison Company filed CSP Contract with Energy Connect Inc. 1/10/2019
1/10/2019 Document Attached to Case - CSP Contract with EnerNOC - Met Ed - Metropolitan Edison Company filed CSP Contract with EnerNOC Inc. 1/10/2019
11/27/2018 Document Published on Web - Document 'Final Annual Rpt Phase III Act 129 PY9 Cvr Ltr' is made public 11/27/2018
11/27/2018 Document Attached to Case - Final Annual Rpt Phase III Act 129 PY9 Cvr Ltr - Metropolitan Edison Co. filed Final Annual Report, Phase III Act 129 Program Yr 9 cover letter. 11/27/2018
11/27/2018 Document Published on Web - Document 'PY9 Final Annual Report - First Energy Co' is made public 11/27/2018
11/20/2018 Document Published on Web - Document 'Withdrawal of Appearance - Triscari / OSBA' is made public 11/20/2018
11/20/2018 Document Attached to Case - Withdrawal of Appearance - Triscari / OSBA - Withdrawal of Appearance of Elizabeth Rose Triscari on behalf of Office of Small Business Advocate filed. 11/20/2018
11/20/2018 Document Published on Web - Document 'Notice of Appearance - Webb & Fure / OSBA' is made public 11/20/2018
11/20/2018 Document Attached to Case - Notice of Appearance - Webb & Fure / OSBA - Notice of Appearance of Sharon E. Webb and Erin K. Fure on behalf of Office of Small Business Advocate filed. 11/20/2018
7/25/2018 Document Published on Web - Document 'Met Ed Phase III Report 6-1-17 to 5-31-18 PY9' is made public 7/25/2018
7/25/2018 Document Removed from Web - Document 'Phase II Report 6-1-17 to 5-31-18 - MetEd' has been removed from Web - {C1551EA1-C96E-C127-8597-64B33D500000} 7/25/2018
7/19/2018 Document Published on Web - Document 'Phase II Report 6-1-17 to 5-31-18 - MetEd' is made public 7/19/2018
7/19/2018 Document Attached to Case - Attach to Case - Phase II Report 6-1-17 to 5-31-18 - MetEd 7/19/2018
7/17/2018 Document EServed to POR - Document '2514767 First Energy Met-Ed Voltus CSP Contract Secretarial Letter.doc' is eServed - {3EA5383D-07D1-C43D-AA7D-64A895C00000} 7/17/2018
7/17/2018 Document Published on Web - Document '2514767 First Energy Met-Ed Voltus CSP Contract Secretarial Letter.doc' is made public 7/17/2018
7/17/2018 Document Served - Other - See Comments - Sec Letter Served 7/17/2018 7/17/2018
7/12/2018 Case History Attached - Case ReOpened - 2514767_CaseHistory 7/12/2018
7/12/2018 Document Attached to Case - Attach Document & Initiate Task - CSP Contract for Voltus Inc (Confidential) - Met Ed 7/12/2018
5/10/2018 Document EServed to POR - Document 'CSP Contract Met-Ed FirstEnergy 5-4-18 - Oracle America SEC LTR M-2015-2514767 to Munsch_.doc' is eServed - {FD6E121D-B124-CB64-8727-634A8BF00000} 5/10/2018
5/10/2018 Document Published on Web - Document 'CSP Contract Met-Ed FirstEnergy 5-4-18 - Oracle America SEC LTR M-2015-2514767 to Munsch_.doc' is made public 5/10/2018
5/10/2018 Document Served - Other - See Comments - CSP Contract Met-Ed FirstEnergy 5-4-18 - Oracle America SEC LTR Served 5/10/2018 5/10/2018
5/10/2018 Case Closed - No active tasks exist for this Case 5/10/2018
5/2/2018 Case ReOpened - ReOpened - OSA 5/2/2018
4/26/2018 Case Closed - No Active Tasks Exist for this Case - Case Closed as no Active Tasks exists for this Case 4/26/2018
4/20/2018 Document Attached to Case - Attach Document & Initiate Task - CSP Contract for Oracle America ( Confidential )- MetEd 4/20/2018
4/16/2018 Document Attached to Case - Attach Document & Initiate Task - CSP Contract for Oracle America - MetEd 4/19/2018
4/12/2018 Document EServed to POR - Document 'CSP Contract Met-Ed FirstEnergy - Oracle America SEC LTR M-2015-2514767 to John L Munsch_.doc' is eServed - {9EB907DF-81B2-C958-868D-62BA8EA00000} 4/12/2018
4/12/2018 Document Served - Other - See Comments - Sec Letter Served 4/12/2018 4/12/2018
4/12/2018 Document Published on Web - Document 'CSP Contract Met-Ed FirstEnergy - Oracle America SEC LTR M-2015-2514767 to John L Munsch_.doc' is made public 4/12/2018
3/28/2018 Document Attached to Case - Attach Document & Initiate Task - Met Ed CSP Contract for Oracle America 3/28/2018
3/28/2018 Case History Attached - Case ReOpened - 2514767_CaseHistory 3/28/2018
1/18/2018 Document Published on Web - Document 'Met Ed Cover Ltr to Phase III Act 129 Semi-Annual Rpt PY 9 6/1/17-11/30/17' is made public 1/18/2018
1/18/2018 Document Published on Web - Document 'Met Ed Phase III Act 129 Semi-Annual Report PY9-1.pdf' is made public 1/18/2018
1/18/2018 Document Attached to Case - Met Ed Cover Ltr to Phase III Act 129 Semi-Annual Rpt PY 9 6/1/17-11/30/17 - Met Ed filed Phase III Act 129 semi-annual report, program year 9 for June 1, 2017 through November 30, 3017. 1/18/2018
11/28/2017 Document Published on Web - Document 'Annual Report ACT 129 - Met-Ed' is made public 11/28/2017
11/28/2017 Document Published on Web - Document 'FirstEnergy Opcos - PY8 Annual Report-Met-Ed' is made public 11/28/2017
11/28/2017 Document Attached to Case - Annual Report ACT 129 - Met-Ed - Metropolitan Edison Company filed ACT 129 Phase III Annual Report. 11/28/2017
7/28/2017 Document Published on Web - Document 'Phase III Year 8 Semi-Annual Report - Met Ed' is made public 7/28/2017
7/28/2017 Document Attached to Case - Phase III Year 8 Semi-Annual Report - Met Ed - Metropolitan Edison Company filed Semi-Annual Report for Act 129 EE&C Phase III Program Year 8. 7/28/2017
1/24/2017 Document Published on Web - Document 'Phase III report Jun to Nov 2016 Cover Letter - Met Ed' is made public 1/24/2017
1/24/2017 Document Published on Web - Document 'Phase III Semi-Annual Report PY8-1 - Met Ed' is made public 1/24/2017
1/24/2017 Document Attached to Case - Phase III report Jun to Nov 2016 Cover Letter - Met Ed - Metropolitan Edison Company filed Act 129 Phase III Semi-Annual Report for June 2016 to November 2016. 1/24/2017
12/22/2016 Document Attached to Case - Revision to CSP Contract w/ ADM Associates Inc - Met Ed - Met Ed filed revision to conservation service provider contract with ADM Associates Inc. 12/22/2016
12/22/2016 Document Attached to Case - Evaluation Measurement & Verification CSP Award - Met Ed - Met Ed filed evaluation measurement and verification conservation service provider contract award. 12/22/2016
12/15/2016 Document Published on Web - Document 'CSP Contract SEC LTR FirstEnergy - Energy Connect Inc Comm and Indus Demand M-2015-2514767 to John L Munsch .docx' is made public 12/15/2016
12/15/2016 Document Removed from Web - Document 'CSP Contract SEC LTR FirstEnergy - EnerNoc Inc - Comm and Indus Demand M-2015-2514767 to John L Munsch .docx' has been removed from Web 12/15/2016
12/15/2016 Document Published on Web - Document 'CSP Contract SEC LTR FirstEnergy - EnerNoc Inc - Comm and Indus Demand M-2015-2514767 to John L Munsch .docx' is made public 12/15/2016
12/15/2016 Document Served - Other - See Comments - Two Sec Letters Served Energy Connect, Inc. and EnerNoc, Inc. 12/15/2016 12/15/2016
12/15/2016 Document Published on Web - Document 'CSP Contract SEC LTR FirstEnergy - EnerNoc Inc - Comm and Indus Demand M-2015-2514767 to John L Munsch .docx' is made public 12/15/2016
12/2/2016 Document Attached to Case - Resubmitted CSP Contract with Energy Connect Inc-Met Ed et al - Met Ed et al filed Resubmitted CSP Contracts with Energy Connect Inc & EnerNOC Inc 12/2/2016
12/2/2016 Document Attached to Case - Resubmitted CSP Contract with EnerNOC Inc-Met Ed et al - Met Ed et al filed Resubmitted CSP Contracts with Energy Connect Inc & EnerNOC Inc 12/2/2016
10/20/2016 Document Attached to Case - CSP Contract with FE Companies & EnerNoc Inc-Met Ed et al - Met Ed et al filed CSP Contract with FE Companies & EnerNoc Inc 10/20/2016
6/10/2016 Document Attached to Case - CSP Contract modifications with Sodexo - Met Ed - Metropolitan Edison Company filed modifications to Conservation Service Provider Contract with Sodexo Operations LLC. 6/10/2016
6/10/2016 Document Published on Web - Document 'CSP Contract modifications with Sodexo - Met Ed' is made public 6/10/2016
6/10/2016 Document Served - Other - See Comments - CSP Contract SEC LTR First Energy - Sodexo letter PO 55121999 Program Incentives Served 6/10/2016 6/10/2016
6/10/2016 Document Published on Web - Document 'CSP Contract SEC LTR FirstEnergy - Sodexo Operations LLC - PO 55121998 Program Mgt - M-2015-2514767 to John L Munsch .docx' is made public 6/10/2016
6/10/2016 Document Served - Other - See Comments - CSP Contract SEC LTR FirstEnergy - Sodexo Operations LLC - PO 55121998 Program Mgt Served 6/10/2016 6/10/2016
6/10/2016 Document Published on Web - Document 'CSP Contract SEC LTR First Energy - Sodexo letter PO 55121999 Program Incentives - M-2015-2514767 to John L Munsch .docx' is made public 6/10/2016
6/2/2016 Document Served - Other - See Comments - SEC LETTER SERVED 6/2/16, PO #55122009 6/2/2016
6/2/2016 Document Published on Web - Document 'CSP Contract SEC LTR FirstEnergy - Honeywell Smart Grid Prog Mgt - PO 55122008 - M-2015-2514767 to John L Munsch .docx' is made public 6/2/2016
6/2/2016 Document Published on Web - Document 'CSP Contract SEC LTR FirstEnergy - Honeywell Smart Grid Solutions - Incentives PO 55122009 - M-2015-2514767 to John L Munsch .docx' is made public 6/2/2016
6/2/2016 Document Served - Other - See Comments - SEC LETTER SERVED 6/2/16--PO#55122008 6/2/2016
6/1/2016 Document Published on Web - Document 'CSP Contract SEC LTR FirstEnergy - Power Direct Marketing M-2015-2514767 to John L Munsch .docx' is made public 6/1/2016
6/1/2016 Document Published on Web - Document 'CSP Contract SEC LTR FirstEnergy - Performance Systems Development of NY LLC New Homes Program M-2015-2514767 to John L Munsch .docx' is made public 6/1/2016
6/1/2016 Document Served - Other - See Comments - CSP Contract SEC LTR FirstEnergy - Power Direct Marketing Served 6/1/2016 6/1/2016
6/1/2016 Document Served - Other - See Comments - CSP Contract SEC LTR FirstEnergy - Performance Systems Development of NY LLC Served 6/1/2016 6/1/2016
5/19/2016 Document Published on Web - Document 'CSP Contract SEC LTR FirstEnergy - Enertouch Inc dba Good Cents Solutions- Incentives M-2015-2514767 to John L Munsch .docx' is made public 5/19/2016
5/19/2016 Document Published on Web - Document 'CSP Contract SEC LTR FirstEnergy - Enertouch Inc dba Good Cents Solutions- Program Mgt M-2015-2514767 to John L Munsch .docx' is made public 5/19/2016
5/19/2016 Document Served - Other - See Comments 5/19/2016
5/19/2016 Document Served - Other - See Comments - SEC LETTER SERVED 5/19/16 5/19/2016
5/18/2016 Document Served - Other - See Comments - CSP Contract SEC LTR First Energy - OPower Inc Served 5/18/2016 5/18/2016
5/18/2016 Document Served - Other - See Comments - CSP Contract SEC LTR First Energy - ARCA Recycling Served 5/18/2016 5/18/2016
5/18/2016 Document Published on Web - Document 'CSP Contract SEC LTR First Energy - AM Conservation Group M-2015-2514767 to John L Munsch .doc' is made public 5/18/2016
5/18/2016 Document Published on Web - Document 'CSP Contract SEC LTR First Energy - ARCA Recycling M-2015-2514767 to John L Munsch .doc' is made public 5/18/2016
5/18/2016 Document Published on Web - Document 'CSP Contract SEC LTR First Energy - OPower Inc M-2015-2514767 to John L Munsch .doc' is made public 5/18/2016
5/18/2016 Document Served - Other - See Comments - CSP Contract SEC LTR First Energy - AM Conservation Group Served 5/18/2016 5/18/2016
5/16/2016 Document Attached to Case - CSP Contract PowerDirect Marketing - Met Ed - Metropolitan Edison Company filed Conservation Service Provider Contract with PowerDirect Marketing LLC d/b/a Power Direct energy. 5/16/2016
5/16/2016 Document Attached to Case - CSP Contract with Enertouch - Met Ed - Metropolitan Edison Company filed Conservation Service Provider Contract with Enertouch, Inc. d/b/a GoodCents Solutions. 5/16/2016
5/16/2016 Document Attached to Case - CSP contract with AM Conservation - Met Ed - Metropolitan Edison Company filed Conservation Service Provider Contract with AM Conservation Group, Inc. 5/16/2016
5/16/2016 Document Attached to Case - CSP contract with Performance Sys Dev NY - Met Ed - Metropolitan Edison Company filed Conservation Service Provider Contract with Performance Systems Development of New York, LLC. 5/16/2016
5/16/2016 Document Attached to Case - CSP Contract with Opower - Met Ed - Metropolitan Edison Company filed Conservation Service Provider Contract with Opower, Inc. 5/16/2016
5/13/2016 Document Attached to Case - CSP Contract w/Honeywell International Inc # 55122008 CONFIDENTIAL - Met Ed - Metropolitan Edison Company filed Confidential Conservation Service Provider contract with Honeywell International Inc Purchase Order number 55122008. 5/13/2016
5/13/2016 Document Attached to Case - CSP Contract w/Honeywell International Inc # 55122009 CONFIDENTIAL - Met Ed - Metropolitan Edison Company filed Confidential Conservation Service Provider contract with Honeywell International Inc Purchase Order number 55122009. 5/13/2016
5/12/2016 Document Published on Web - Document 'EE&C Phase III Tariff Approval First Energy.docx' is made public 5/12/2016
5/12/2016 Document Served - Other - See Comments - Sec Letter Served 5/12/2016 5/12/2016
5/11/2016 Document Published on Web - Document 'Annual EE&C Phase III Rate Adj; Supp #20 to Trf #52; Eff: 6/1/16 - MetEd' is made public 5/11/2016
5/6/2016 Document Attached to Case - CSP Contract w/ Performance Systems Development of New York LLC (Purchase Order #55122015) - Met Ed - Met Ed filed conservation service provider contract with Performance Systems Development of New York LLC, purchase order #55122015. 5/6/2016
5/5/2016 Document Attached to Case - 2nd Confidential CSP Contract w/ARCA Recycling Inc #55121962 - Met Ed - Metropolitan Edison Company filed second Confidential Conservation Service Provider contract with ARCA Recycling Inc. 5/5/2016
4/29/2016 Document Attached to Case - Cover Letter to CSP Contract 55121999 w Sodexo Operations LLC - Met Ed - Metropolitan Edison Company filed Conservation Service Provider Contract with Sodexo Operations LLC. 4/29/2016
4/29/2016 Document Attached to Case - Cover Letter to CSP Contract 55121998 w Sodexo Operations LLC - Met Ed - Metropolitan Edison Company filed Conservation Service Provider Contract with Sodexo Operations LLC. 4/29/2016
4/28/2016 Document Attached to Case - CSP Contract #55122024 wPowerDirect Marketing - Met Ed - Metropolitan Edison Company filed Conservation Service Provider Contract with Direct Power Marketing LLC d/b/a Power Direct Energy. 4/28/2016
4/28/2016 Document Attached to Case - CSP Contract 5512195 with ARCA Recycling - Met Ed - Metropolitan Edison Company filed Conservation Service Provider Contract with Arca Recycling, Inc. 4/28/2016
4/28/2016 Document Attached to Case - CSP Contract 55121962 w ARCA Recycling - Met Ed - Metropolitan Edison Company filed Conservation Service Provider Contract with ARCA Recycling, Inc. 4/28/2016
4/28/2016 Document Attached to Case - CSP Contract 55122014 w Performance Systems Development NY - Met Ed - Metropolitan Edison Company filed Conservation Service Provider Contract with Performance Systems Development of New York, LLC. 4/28/2016
4/27/2016 Document Attached to Case - CSP Contract w/Enertouch Inc d/b/a GoodCents Solutions - Metropolitan Edison Company filed Conservation Service Provider contract with Enertouch Inc d/b/a GoodCents Solutions (Confidential). 4/27/2016
4/26/2016 Document Attached to Case - CSP Contract 55121980 w AM Conservation Group Inc-Met Ed - Met Ed filed Conservation Service Provider Contract with AM Conservation Group Inc 4/26/2016
4/25/2016 Document Attached to Case - CSP Contract 55121978 w Opower Inc - Met Ed - Metropolitan Edison Company filed Conservation Service Provider Contract with Opower, Inc. 4/25/2016
4/20/2016 Document Published on Web - Document 'Met Ed et al Original Signature Request Ltr' is made public 4/20/2016
4/15/2016 Document Served - Other - See Comments - SEC LETTER SERVED 4/15/16 4/15/2016
4/15/2016 Document Published on Web - Document 'CSP Sec ltr to First Energy - ARCA Recycling to John Munsch M-2015-2514767 .doc' is made public 4/15/2016
3/29/2016 Document Attached to Case - Ltr Adv Will Not be Withdrawing from Jnt Pet for Full Settlmt - EnerNOC - EnerNOC Inc filed letter advising will not be withdrawing from the Joint Petition for Full Settlement. 3/29/2016
3/29/2016 Document Published on Web - Document 'Ltr Adv Will Not be Withdrawing from Jnt Pet for Full Settlmt - EnerNOC ' is made public 3/29/2016
3/22/2016 Document Published on Web - Document 'Letter/Not Withdrawing From Joint Petition for Full Settlement - EnerNOC' is made public 3/22/2016
3/22/2016 Document Attached to Case - Letter/Not Withdrawing From Joint Petition for Full Settlement - EnerNOC - EnerNOC filed letter stating they will not be withdrawing from the Joint Petition for Full Settlement. 3/22/2016
3/17/2016 Document Attached to Case - Letter re not withdrawing from settlement - OCA - Office of Consumer Advocate filed Letter indicating they are not withdrawing from settlement. 3/17/2016
3/17/2016 Document Attached to Case - Letter re not withdrawing from settlement - CAUSE-PA - CAUSE-PA filed Letter indicating they are not withdrawing from settlement. 3/17/2016
3/17/2016 Document Attached to Case - Letter re not withdrawing from settlement - Industrial Customer Groups - Met-Ed Industrial Users Group et al. filed Letter stating they are not withdrawing from settlement. 3/17/2016
3/17/2016 Document Published on Web - Document 'Letter re not withdrawing from settlement - OCA' is made public 3/17/2016
3/17/2016 Document Published on Web - Document 'Letter re not withdrawing from settlement - Industrial Customer Groups' is made public 3/17/2016
3/17/2016 Document Published on Web - Document 'Letter re not withdrawing from settlement - CAUSE-PA' is made public 3/17/2016
3/16/2016 Document Published on Web - Document 'Letter - Met-Ed, Penelec, Penn Power & West Penn Power Not withdrawing from settlement' is made public 3/16/2016
3/16/2016 Document Attached to Case - Communication-Letter.pdf - Office of Small Business Advocate filed Letter indicating they are not withdrawing from Joint Settlement. 3/16/2016
3/16/2016 Document Attached to Case - Letter - Met-Ed, Penelec, Penn Power & West Penn Power Not withdrawing from settlement - Metropolitan Edison Co, Pennsylvania Electric Company, Pennsylvania Power Company and West Penn Power Company filed a letter indicating that they will not be withdrawing from the Joint Settlement at this time. 3/16/2016
3/16/2016 Document Published on Web - Document 'Communication-Letter.pdf' is made public 3/16/2016
3/11/2016 Document Attached to Case - Praecipe to Withdraw Appearance-EnerNoc Inc - EnerNoc Inc filed Praecipe to Withdraw Appearance 3/11/2016
3/11/2016 Document Published on Web - Document 'Praecipe to Withdraw Appearance-EnerNoc Inc' is made public 3/11/2016
3/10/2016 Document Published on Web - Document 'Opinion and Order - 2514767 - OSA - 3-10-16 PM - FirstEnergy Phase III EEC Plan' is made public 3/10/2016
3/10/2016 Document EServed to POR - Document 'Opinion and Order - 2514767 - OSA - 3-10-16 PM - FirstEnergy Phase III EEC Plan' is eServed - {E0AD975F-4F3D-435D-8327-D1F4908AC59D} 3/10/2016
3/10/2016 Document Served - Other - See Comments - ORDER ENTERED 3/10/16 3/10/2016
2/24/2016 Private Document Published on Web - Document 'Testimony of Kevin M. Siedt with Revised Exhibits 1.22.16pdf.pdf' Restricted on Web - {8848938D-BB15-4482-B326-DEBC5B4ECA62} 2/24/2016
2/24/2016 Document EServed to POR - Document 'ENERNOC - VERIFICATION - FIRST ENERGY - PETER CAVAN.PDF' is eServed - {F2DEDF8F-4306-4B28-AFE6-6CF32DA86094} 2/24/2016
2/24/2016 Private Document Published on Web - Document 'PETER CAVAN - FE - ENERNOC - STATEMENT 1R.pdf' Restricted on Web - {E431AD1B-74DD-4AA1-BDBC-F5AA64DDF68A} 2/24/2016
2/24/2016 Document EServed to POR - Document 'EnerNOC - FIRST ENERGY - DIRECT TESTIMONY OF PETER CAVAN -STATEMENT 1R.docx' is eServed - {A2808214-A15E-469A-877C-066B793B2678} 2/24/2016
2/24/2016 Private Document Published on Web - Document 'ENERNOC - VERIFICATION - FIRST ENERGY - PETER CAVAN.PDF' Restricted on Web - {F2DEDF8F-4306-4B28-AFE6-6CF32DA86094} 2/24/2016
2/24/2016 Private Document Published on Web - Document 'OCA Direct Testimony - Crandall - St. 1 (Met-Ed) 'Final'.PDF' Restricted on Web - {291C02A9-BCE1-41AD-89D8-C103B14EB9A4} 2/24/2016
2/24/2016 Private Document Published on Web - Document 'OCA Direct Testimony - Colton - St. No. 2 (Met-Ed) 'Final'.PDF' Restricted on Web - {99534973-325E-4E3F-8C5C-78E036F8F7B6} 2/24/2016
2/24/2016 Document EServed to POR - Document 'Miller Testimony FINAL 11.20.15.pdf' is eServed - {DA38DDE7-2A75-4133-989C-BD024C131118} 2/24/2016
2/24/2016 Private Document Published on Web - Document 'Miller Testimony FINAL 11.20.15.pdf' Restricted on Web - {DA38DDE7-2A75-4133-989C-BD024C131118} 2/24/2016
2/24/2016 Document EServed to POR - Document 'OCA Direct Testimony - Colton - St. No. 2 (Met-Ed) 'Final'.PDF' is eServed - {99534973-325E-4E3F-8C5C-78E036F8F7B6} 2/24/2016
2/24/2016 Document EServed to POR - Document 'PETER CAVAN - FE - ENERNOC - STATEMENT 1R.pdf' is eServed - {E431AD1B-74DD-4AA1-BDBC-F5AA64DDF68A} 2/24/2016
2/24/2016 Document EServed to POR - Document 'OCA Direct Testimony - Crandall - St. 1 (Met-Ed) 'Final'.PDF' is eServed - {291C02A9-BCE1-41AD-89D8-C103B14EB9A4} 2/24/2016
2/24/2016 Document EServed to POR - Document 'Dargie Phase III Testimony FINAL 11.20.15.pdf' is eServed - {3A9F96E0-A9CF-40FA-B07C-28295A3A0EDC} 2/24/2016
2/24/2016 Private Document Published on Web - Document 'Dargie Phase III Testimony FINAL 11.20.15.pdf' Restricted on Web - {3A9F96E0-A9CF-40FA-B07C-28295A3A0EDC} 2/24/2016
2/24/2016 Private Document Published on Web - Document 'EnerNOC - FIRST ENERGY - DIRECT TESTIMONY OF PETER CAVAN -STATEMENT 1R.docx' Restricted on Web - {A2808214-A15E-469A-877C-066B793B2678} 2/24/2016
2/24/2016 Document EServed to POR - Document 'Testimony of Kevin M. Siedt with Revised Exhibits 1.22.16pdf.pdf' is eServed - {8848938D-BB15-4482-B326-DEBC5B4ECA62} 2/24/2016
2/18/2016 Document Attached to Case - CSP Contract w/Applied Energy Group (AEG) Inc -Met Ed/Penelec/Penn Power/West Penn Power - Metropolitan Edison Company, Pennsylvania Electric Company, Pennsylvania Power Company, and West Penn Power Company filed Conservation Service Provider Contract with Applied Energy Group (AEG) Inc.(Confidential) 2/18/2016
2/18/2016 Document Served - Other - See Comments - Sec Letter Served 2/18/2016 2/18/2016
2/18/2016 Document Published on Web - Document 'CSP Contract FirstEnergy - Applied Energy Group SEC LTR M-2015-2514767 to John L Munsch .doc' is made public 2/18/2016
2/12/2016 Document Published on Web - Document 'M-2015-2514767 et al FE EEC Phase III Certification Order.docx' is made public 2/12/2016
2/12/2016 Document Attached to Case - Settlement Agreement - First Energy Companies - Metropolitan Edison Company, Pennsylvania Electric Company, Pennsylvania Power Company and West Penn Power Company filed Joint Petition for Full Settlement. 2/12/2016
2/12/2016 Document EServed to POR - Document 'M-2015-2514767 et al FE EEC Phase III Certification Order.docx' is eServed - {30BCCE96-20D3-4447-B289-50152F0F64D7} 2/12/2016
2/12/2016 Document Published on Web - Document 'Settlement Agreement - First Energy Companies' is made public 2/12/2016
2/11/2016 Document Published on Web - Document 'Letter re Joint Settlement - PSU' is made public 2/11/2016
2/11/2016 Document Attached to Case - Letter re Joint Settlement - PSU - Pennsylvania State University filed letter regarding Joint Settlement. 2/11/2016
2/1/2016 Private Document Published on Web - Document 'Electronic Transcript & Exhs to 1/27/206 Initial Hearing (pgs 22-49)' Restricted on Web - {1A838F8E-35EA-4331-A761-60E75F13F1CC} 2/1/2016
2/1/2016 Document Attached to Case - Electronic Transcript & Exhs to 1/27/206 Initial Hearing (pgs 22-49) - Transcript and Exhibits filed to Initial Hearing held January 27, 2016 with ALJ Elizabeth H. Barnes, Hearing Room 2 Commonwealth Keystone Bldg, Harrisburg, Pa. (pgs 22 - 49) 2/1/2016
1/27/2016 Document Published on Web - Document 'Cover Ltr & Cert of Svc to PreServed Tesimony of Mitchell Miller - CAUSE-PA' is made public 1/27/2016
1/27/2016 Document Attached to Case - Cover Ltr & Cert of Svc to PreServed Tesimony of Mitchell Miller - CAUSE-PA - Coalition for Affordable Utility Services and Energy Efficiency in Pennsylvania filed CAUSE-PA Statement No. 1 Direct Testimony of Mitchell Miller. 1/27/2016
1/27/2016 Private Document Published on Web - Document 'PreServed Testimony of Mitchell Miller - CAUSE-PA' Restricted on Web - {79071152-80B5-4F67-81B2-A55C496E743B} 1/27/2016
1/27/2016 Document Attached to Case - PreServed Testimony of Mitchell Miller - CAUSE-PA - Coalition for Affordable Utility Services and Energy Efficiency in Pennsylvania filed CAUSE-PA Statement No. 1 Direct Testimony of Mitchell Miller. 1/27/2016
1/27/2016 Document EServed to POR - Document 'PreServed Testimony of Mitchell Miller - CAUSE-PA' is eServed - {79071152-80B5-4F67-81B2-A55C496E743B} 1/27/2016
1/22/2016 Document EServed to POR - Document 'M-2015-2514767 et al Order Suspending Procedural Schedule in First Energy Phase III EEC.docx' is eServed - {C566BB65-69E2-415D-BB39-B92448302246} 1/22/2016
1/22/2016 Document Published on Web - Document 'Certificate of Service-Met Ed et al' is made public 1/22/2016
1/22/2016 Document Published on Web - Document 'Certificate of Service-Met Ed et al' is made public 1/22/2016
1/22/2016 Document Published on Web - Document 'M-2015-2514767 et al Order Suspending Procedural Schedule in First Energy Phase III EEC.docx' is made public 1/22/2016
1/22/2016 Document Attached to Case - Certificate of Service-Met Ed et al - Met Ed et al filed Certificate of Service 1/22/2016
1/22/2016 Document Attached to Case - Letter advise not submit Rebuttal Testimony-Wal-Mart & Sam's - Wal-Mart Stores East LP and Sam's East Inc filed letter advising not submitting Rebuttal Testimony; Wal-Mart reserves right to participate in Hearings and Briefings. 1/22/2016
1/22/2016 Document Attached to Case - Certificate of Service-Met Ed et al - Met Ed et al filed Certificate of Service 1/22/2016
1/22/2016 Document Published on Web - Document 'Letter advise not submit Rebuttal Testimony-Wal-Mart & Sam's' is made public 1/22/2016
1/21/2016 Document Attached to Case - Cert of Svc of Interrogs Set #II - CAUSE-PA - CAUSE-PA filed Certificate of Service of Interrogatories Set No. II. 1/21/2016
1/21/2016 Document Published on Web - Document 'Cert of Svc of Interrogs Set #II - CAUSE-PA' is made public 1/21/2016
1/19/2016 Document Published on Web - Document 'M-2015-2514767 et al Initial Hearing.doc' is made public 1/19/2016
1/19/2016 Document Attached to Case - Cert of Srvc Interrog to OCA - Met Ed - Metropolitan Edison Company filed Certificate of Service. 1/19/2016
1/19/2016 Document Published on Web - Document 'Cert of Srvc Interrog to OCA - Met Ed' is made public 1/19/2016
1/19/2016 Document Removed from Web - Document 'Cert of Srvc Interrog to OCA - FirstEnergy Cos' has been removed from Web 1/19/2016
1/19/2016 Document Published on Web - Document 'Cert of Srvc Interrog to OCA - FirstEnergy Cos' is made public 1/19/2016
1/19/2016 Document EServed to POR - Document 'M-2015-2514767 et al Initial Hearing.doc' is eServed - {3F90641A-F6D3-43FC-A068-8EFF2350B651} 1/19/2016
1/12/2016 Document Attached to Case - Revised Exhibit - Met Ed - Metropolitan Edison Company filed Revised Exhibits. 1/12/2016
1/12/2016 Document Published on Web - Document 'Cert of Svc of Dir Test of Geoffrey Crandall OCA Stmt #1 & Roger Colton OCA Stmt #2 - OCA' is made public 1/12/2016
1/12/2016 Document Published on Web - Document 'Letter Adv Not Submitting Direct Tesimony - Industrial Customer Groups' is made public 1/12/2016
1/12/2016 Document Published on Web - Document 'M-2015-2514767 Order Granting Pet to Intervene.docx' is made public 1/12/2016
1/12/2016 Document Published on Web - Document 'Letter Adv Not Filing Direct Testimony - Walmart' is made public 1/12/2016
1/12/2016 Document EServed to POR - Document 'M-2015-2514767 Order Granting Pet to Intervene.docx' is eServed - {170B5FAC-CCC6-4C5F-877B-FC0494033425} 1/12/2016
1/12/2016 Document Attached to Case - Letter Adv Not Filing Direct Testimony - OSBA - Office of Small Business Advocate filed letter advising will not be filing Direct Testimony, reserves right to filed Rebuttal Testimony. 1/12/2016
1/12/2016 Document Attached to Case - Cert of Svc of Stmt #1 Dir Testimony of Mitchell Miller - CAUSE-PA - CAUSE-PA filed Certificate of Service of CAUSE-PA Statement No. 1, the Direct Testimony of Mitchell Miller. 1/12/2016
1/12/2016 Document Published on Web - Document 'Cert of Svc of Stmt #1 Dir Testimony of Mitchell Miller - CAUSE-PA' is made public 1/12/2016
1/12/2016 Document Attached to Case - Cert of Svc of Dir Test of Geoffrey Crandall OCA Stmt #1 & Roger Colton OCA Stmt #2 - OCA - Office of Consumer Advocate filed Certificate of Service of Direct Testimony of Geoffrey C. Crandall, OCA Statement No. 1 and Roger D. Colton, OCA Statement No. 2. 1/12/2016
1/12/2016 Document Published on Web - Document 'Letter Adv Not Filing Direct Testimony - PSU' is made public 1/12/2016
1/12/2016 Document Attached to Case - Letter Adv Not Filing Direct Testimony - PSU - The Pennsylvania State University filed letter advising will not be filing Direct Testimony, reserves right to filed Rebuttal Testimony. 1/12/2016
1/12/2016 Document Attached to Case - Letter Adv Not Filing Direct Testimony - Walmart - Wal-Mart Stores East LP and Sam's East Inc filed letter advising will not be filing Direct Testimony, reserves right to filed Rebuttal Testimony. 1/12/2016
1/12/2016 Document Published on Web - Document 'Revised Exhibit - Met Ed' is made public 1/12/2016
1/12/2016 Document Published on Web - Document 'Letter Adv Not Filing Direct Testimony - OSBA' is made public 1/12/2016
1/12/2016 Document Attached to Case - Letter Adv Not Submitting Direct Tesimony - Industrial Customer Groups - Met-Ed Industrial Users Group, Penelec Industrial Customer Alliance, Penn Power Users Group and West Penn Power Industrial Intervenors filed letter advising will not be submitting direct testimony, reserves right to file rebuttal testimony. 1/12/2016
1/11/2016 Document EServed to POR - Document 'M-2015-2514767 Phase III Protective Order.docx' is eServed - {5A0043DB-03EF-4D11-8A77-27A54C0A8EB6} 1/11/2016
1/11/2016 Document EServed to POR - Document 'M-2015-2514767 Scheduling Order First Energy Phase III EEC.docx' is eServed - {C2A375EF-7C53-4748-84F5-ED7359E25A7E} 1/11/2016
1/11/2016 Document Published on Web - Document 'M-2015-2514767 Phase III Protective Order.docx' is made public 1/11/2016
1/11/2016 Document Published on Web - Document 'M-2015-2514767 Scheduling Order First Energy Phase III EEC.docx' is made public 1/11/2016
1/8/2016 Document Published on Web - Document 'M-2015-2514767 Phase III Protective Order.docx' is made public 1/8/2016
1/8/2016 Document Published on Web - Document 'Petition to Intervene - EnerNOC' is made public 1/8/2016
1/8/2016 Document Published on Web - Document 'Prehearing Memorandum - EnerNOC' is made public 1/8/2016
1/8/2016 Document EServed to POR - Document 'M-2015-2514767 Phase III Protective Order.docx' is eServed - {EF58B1A7-CBF8-47F0-AE69-74C99BEBFD77} 1/8/2016
1/8/2016 Document Published on Web - Document 'M-2015-2514767 et al Scheduling Order First Energy Phase III EEC.docx' is made public 1/8/2016
1/8/2016 Document EServed to POR - Document 'M-2015-2514767 et al Scheduling Order First Energy Phase III EEC.docx' is eServed - {3AA34E3F-B593-418D-AAF9-D1D825D65228} 1/8/2016
1/8/2016 Document Attached to Case - Prehearing Memorandum - EnerNOC - EnerNOC, Inc. filed Prehearing Memorandum. 1/8/2016
1/8/2016 Document Attached to Case - Petition to Intervene - EnerNOC - EnerNOC filed Petition to Intervene in Met-Ed, Penelec, West Penn Power and Pennsylvania Power Company's petition for approval of its Act 129 Phase III EE&C Plan 1/8/2016
1/6/2016 Document Attached to Case - Cert of Srvc Interrog III - OCA - Office of Consumer Advocate filed Certificate of Service of Interrogatories Set III. 1/6/2016
1/6/2016 Document Published on Web - Document 'Prehearing Memorandum - CAUSE PA ' is made public 1/6/2016
1/6/2016 Private Document Published on Web - Document 'Electronic Transcript - PHC 1-5-2016 (p. 1-21)' Restricted on Web - {FCC229EF-9D6F-40F2-ADB4-F986ADA76446} 1/6/2016
1/6/2016 Document Published on Web - Document 'Cert of Srvc Interrog III - OCA' is made public 1/6/2016
1/6/2016 Document Attached to Case - Electronic Transcript - PHC 1-5-2016 (p. 1-21) - Initial Prehearing Conference with ALJ Elizabeth H. Barnes held January 5, 2016 at 1:30 p.m. filed. 1/6/2016
1/6/2016 Document Removed from Web - Document 'Prehearing Memorandum - CAUSE-PA' has been removed from Web 1/6/2016
1/5/2016 Document Attached to Case - Comments - OCA - OCA filed comments. 1/5/2016
1/5/2016 Document Attached to Case - Comments - EnergyHub - EnergyHub filed comments. 1/5/2016
1/5/2016 Document Published on Web - Document 'Comments - EEFA' is made public 1/5/2016
1/5/2016 Document Attached to Case - Communication-Comments.pdf - PennFuture, Sierra Club, Environmental Defense Fund and Clean Air Council filed comments. 1/5/2016
1/5/2016 Document Attached to Case - Jnt Petition to Intervene & Ans-Met-Ed Industrial Users Grp et al - Met-Ed Industrial Users Grp et al filed Jnt Petition to Intervene & Ans 1/5/2016
1/5/2016 Document Published on Web - Document 'Cover Page to Comments - PennFuture et al' is made public 1/5/2016
1/5/2016 Document Attached to Case - Cover Page to Comments - PennFuture et al - PennFuture, Sierra Club, Environmental Defense Fund and Clean Air Council filed comments. 1/5/2016
1/5/2016 Document Published on Web - Document 'Jnt Petition to Intervene & Ans-Met-Ed Industrial Users Grp et al' is made public 1/5/2016
1/5/2016 Document Published on Web - Document 'Comments - MEIUG et al' is made public 1/5/2016
1/5/2016 Document Published on Web - Document 'Communication-Comments.pdf' is made public 1/5/2016
1/5/2016 Document Attached to Case - Comments - MEIUG et al - Met Ed Industrial Users Group, Penelec Industrial Customer Alliance, Penn Power Users Group and West Penn Power Industrial Intervenors filed comments. 1/5/2016
1/5/2016 Document Published on Web - Document 'Comments - EnergyHub' is made public 1/5/2016
1/5/2016 Document Attached to Case - Comments - EEFA - Energy Efficiency for All filed Comments. 1/5/2016
1/5/2016 Document Published on Web - Document 'Prehearing Memorandum - Industrial Customer Groups' is made public 1/5/2016
1/5/2016 Document Published on Web - Document 'Comments - OCA' is made public 1/5/2016
1/5/2016 Document Attached to Case - Prehearing Memorandum - Industrial Customer Groups - Met-Ed Industrial Users Group et al. filed Prehearing Memorandum. 1/5/2016
1/5/2016 Document Attached to Case - Comments - RESA - Retail Energy Supply Association filed comments. 1/5/2016
1/5/2016 Document Published on Web - Document 'Comments - RESA' is made public 1/5/2016
1/4/2016 Document Published on Web - Document 'Petition to Intervene - RESA' is made public 1/4/2016
1/4/2016 Document Attached to Case - Answer to Petition - OSBA - Office of Small Business Advocate filed Answer to Petition. 1/4/2016
1/4/2016 Document Attached to Case - Petition to Intervene - RESA - Retail Energy Supply Association filed Petition to Intervene. 1/4/2016
1/4/2016 Document Published on Web - Document 'Answer to Petition - OSBA' is made public 1/4/2016
12/31/2015 Document Attached to Case - Petition to Intervene - Wal-mart East & Sam's East - Wal-Mart Stores East LP and Sam's East Inc filed a petition to intervene. 12/31/2015
12/31/2015 Document Published on Web - Document 'Prehearing Memorandum - Wal-mart East & Sam's East' is made public 12/31/2015
12/31/2015 Document Attached to Case - Prehearing Memorandum - Wal-mart East & Sam's East - Wal-Mart Stores East, LP and Sam's East, Inc. filed Prehearing Memorandum. 12/31/2015
12/31/2015 Document Published on Web - Document 'Petition to Intervene - Wal-mart East & Sam's East' is made public 12/31/2015
12/30/2015 Document Published on Web - Document 'Prehearing Memorandum - CAUSE-PA' is made public 12/30/2015
12/30/2015 Document Published on Web - Document 'Pennsylvania State University -Prehearing Memorandum.PDF' is made public 12/30/2015
12/30/2015 Document Published on Web - Document 'CAUSE-PA’s - Letter in Lieu of Comments ' is made public 12/30/2015
12/30/2015 Document Attached to Case - Pennsylvania State University -Prehearing Memorandum.PDF - The Pennsylvania State University filed Prehearing Memorandum. 12/30/2015
12/30/2015 Document Published on Web - Document 'Petition to Intervene - Pennsylvania State Univer.' is made public 12/30/2015
12/30/2015 Document Attached to Case - CAUSE-PA’s - Letter in Lieu of Comments - CAUSE-PA's filed a Letter in Lieu of Comments to the Joint Petition of Metropolitan Edison Company, Pennsylvania Electric Company, Pennsylvania Power Company, and West Penn Power Company For Approval of their Act 129 Phase III Energy Efficiency and Conservation Plans and their Prehearing Memorandum 12/30/2015
12/30/2015 Document Published on Web - Document 'OCA - Prehearing Memorandum' is made public 12/30/2015
12/30/2015 Document Attached to Case - OCA - Prehearing Memorandum - OCA filed Prehearing Memorandum 12/30/2015
12/30/2015 Document Attached to Case - Prehearing Memorandum - CAUSE-PA - CAUSE-PA's filed a Letter in Lieu of Comments to the Joint Petition of Metropolitan Edison Company, Pennsylvania Electric Company, Pennsylvania Power Company, and West Penn Power Company For Approval of their Act 129 Phase III Energy Efficiency and Conservation Plans and their Prehearing Memorandum 12/30/2015
12/30/2015 Document Attached to Case - Petition to Intervene - Pennsylvania State Univer. - The Pennsylvania State University filed Petition to Intervene. 12/30/2015
12/29/2015 Document Attached to Case - Prehearing Memorandum-Met Ed et al - Met Ed et al filed Prehearing Memorandum 12/29/2015
12/29/2015 Document Published on Web - Document 'Prehearing Memorandum-Met Ed et al' is made public 12/29/2015
12/29/2015 Document Published on Web - Document 'Joint Petition for a Protective Order-Met Ed et al' is made public 12/29/2015
12/29/2015 Document Attached to Case - Joint Petition for a Protective Order-Met Ed et al - Met Ed et el filed Joint Petition for a Protective Order 12/29/2015
12/24/2015 Document EServed to POR - Document 'M-2015-2514767 et al Prehearing Conference Order (FE EEC Phase III).docx' is eServed - {724F8EB2-8650-4CAF-BA27-2871532641EC} 12/24/2015
12/24/2015 Document Published on Web - Document 'M-2015-2514767 et al Prehearing Conference Order (FE EEC Phase III).docx' is made public 12/24/2015
12/23/2015 Document Attached to Case - Prehearing Memorandum - OSBA - Office of Smal Business Advocate filed Prehearing Memorandum. 12/23/2015
12/23/2015 Document Published on Web - Document 'Prehearing Memorandum - OSBA' is made public 12/23/2015
12/18/2015 Document Attached to Case - Notice of Appearance - Triscari/OSBA - Notice of Appearance of Elizabeth Rose Triscari, Esquire, on behalf of Office of Small Business Advocate filed. 12/18/2015
12/18/2015 Document Published on Web - Document 'Cert of Srvc Interrog Set I - OCA' is made public 12/18/2015
12/18/2015 Document Published on Web - Document 'Notice of Intervention - OSBA' is made public 12/18/2015
12/18/2015 Document Attached to Case - Cert of Srvc Interrog Set I - OCA - Office of Consumer Advocate filed Certificate of Service of Interrogatories Set I. 12/18/2015
12/18/2015 Document Published on Web - Document 'Notice of Appearance - Triscari/OSBA' is made public 12/18/2015
12/18/2015 Document Attached to Case - Notice of Intervention - OSBA - Office of Small Business Advocate filed Notice of Intervention. 12/18/2015
12/17/2015 Document Published on Web - Document 'Petition to Intervene - CAUSE PA' is made public 12/17/2015
12/17/2015 Document Attached to Case - Petition to Intervene - CAUSE PA - Coalition for Affordable Utility Services and Energy Efficiency in Pennsylvania filed petition to intervene. 12/17/2015
12/10/2015 Document Published on Web - Document 'Notice of Intervention - OCA' is made public 12/10/2015
12/10/2015 Document Attached to Case - Notice of Intervention - OCA - Office of Consumer Advocate filed Notice of Intervention. 12/10/2015
12/9/2015 Document Published on Web - Document 'M-2015-2514767 et al Initial Prehearing Conference.docx' is made public 12/9/2015
12/9/2015 Document EServed to POR - Document 'M-2015-2514767 et al Initial Prehearing Conference.docx' is eServed - {3B661047-5AD4-4C39-9858-74FF94ED4B2E} 12/9/2015
12/2/2015 Document Published on Web - Document 'EE&C Phase III Publication Notice.doc' is made public 12/2/2015
11/25/2015 Document Published on Web - Document 'Met-Ed Phase III Jt Petition 11.23.15.pdf' is made public 11/25/2015
11/25/2015 Document Published on Web - Document 'Met-Ed Phase III Kevin Siedt Testimony & Exhibits.pdf' is made public 11/25/2015
11/25/2015 Document Published on Web - Document 'Met-Ed Phase III Plan w Appendices COMBINED.pdf' is made public 11/25/2015
11/25/2015 Case Created - M-2015-2514767 - Metropolitan Edison Company filed Petition for Approval of its Act 129 Phase III Energy Efficiency and Conservation Plan. 11/25/2015
11/25/2015 Assigned Responsible Bureau - ALJ 11/25/2015
11/25/2015 Document Published on Web - Document 'Met-Ed Phase III Dargie Testimony FINAL 11.20.15.pdf' is made public 11/25/2015
11/25/2015 Document Published on Web - Document 'Met-Ed Phase III Miller Testimony FINAL 11.20.15.pdf' is made public 11/25/2015
11/25/2015 Document Published on Web - Document 'Other Miscellaneous Document' is made public 11/25/2015
Document Name Document Type eFiling Confirmation Number Date Received Post On Date Date Served Reference Docket Number
PY 13 FINAL SEMI - ANNUAL RPT - MET-ED ETC Other Miscellaneous Document 9/30/2022 9/30/2022 M-2015-2514767
PY 12 2ND AMENDED FINAL ANNUAL RPT - MET-ED ETC Other Miscellaneous Document 4/7/2022 4/11/2022 M-2015-2514767
PY 12 AMENDED FINAL ANNUAL RPT - MET-ED ETC Other Miscellaneous Document 3/29/2022 4/5/2022 M-2015-2514767
PY12 FINAL ANNUAL REPORT - MET ED, PENELEC, PENN POWER, WPP Case Related Document 11/15/2021 11/17/2021 M-2015-2514767
Q2 PY12 SEMI ANNUAL REPORT - MET ED, PENELEC, PENN POWER, WEST PENN POWER Case Related Document 7/15/2021 7/16/2021 M-2015-2514767
SEMI ANNUAL REPORT - PY12 - MET ED, PENELEC, PENN POWER, WEST PENN POWER Case Related Document 3/15/2021 3/15/2021 M-2015-2514767
PY11 ANNUAL REPORT 1 FEB 12 2021 Other Miscellaneous Document 3/9/2021 M-2015-2514767
COVER LTR RE FINAL ANNUAL RPT PHASE III PY 11 (6/1/19-5/31/2020) - MET-ED ET AL Other Miscellaneous Document 2/16/2021 3/9/2021 M-2015-2514767
SEMI-ANNUAL REPORT PY11 - MET ED, PENELEC, PENN POWER, WEST PENN POWER Case Related Document 7/15/2020 7/23/2020 M-2015-2514767
MET ED ACT 129 PHASE III SEMI-ANNUAL PY11 Other Miscellaneous Document 1/15/2020 1/21/2020 M-2015-2514767
MET ED PENELEC PENN PWR WPP PHASE III PY 10 EE&C FINAL ANNUAL REPORT Other Miscellaneous Document 11/15/2019 12/3/2019 M-2015-2514767
COVER LETTER TO METED PHASE III PY 10 SEMI-ANNUAL REPORT Case Related Document 7/15/2019 7/22/2019 M-2015-2514767
METED PHASE III PY 10 SEMI-ANNUAL REPORT Case Related Document 7/22/2019 M-2015-2514767
COVER LETTER OF CSP CONTRACT CHANGE FOR ORACLE AMERICA INC RE THE RESIDENTIAL BEHAVIORAL - DEMAND RESPONSE (CALL CENTER SERVICES) PROGRAM-MET-ED Other Miscellaneous Document 3/25/2019 3/28/2019 M-2015-2514767
COVER LETTER RE CSP CONTRACT CHANGE RE FOR THE RESIDENTIAL BEHAVIORAL - DEMAND RESPONSE PROGRAM-WITH ORACLE AMERICA INC-MET-ED Other Miscellaneous Document 3/25/2019 3/28/2019 M-2015-2514767
COVER LETTER RE SEMI-ANNUAL REPORT PHASE III PROGRAM PERIOD 6/1/18 TO 11/30/18-METROPOLITAN EDISON CO Other Miscellaneous Document 1/15/2019 1/18/2019 M-2015-2514767
FE SEMI-ANNUAL REPORT PY10-1 Other Miscellaneous Document 1/18/2019 M-2015-2514767
FINAL ANNUAL RPT PHASE III ACT 129 PY9 CVR LTR Other Miscellaneous Document 11/15/2018 11/27/2018 M-2015-2514767
PY9 FINAL ANNUAL REPORT - FIRST ENERGY CO Other Miscellaneous Document 11/27/2018 M-2015-2514767
WITHDRAWAL OF APPEARANCE - TRISCARI / OSBA Letter 11/19/2018 11/20/2018 M-2015-2514767
NOTICE OF APPEARANCE - WEBB & FURE / OSBA Notice of Appearance 11/19/2018 11/20/2018 M-2015-2514767
MET ED PHASE III REPORT 6-1-17 TO 5-31-18 PY9 Other Miscellaneous Document 7/13/2018 7/25/2018 M-2015-2514767
2514767 FIRST ENERGY MET-ED VOLTUS CSP CONTRACT SECRETARIAL LETTER.DOC Secretarial Letter 7/17/2018 7/17/2018 M-2015-2514767
CSP CONTRACT MET-ED FIRSTENERGY 5-4-18 - ORACLE AMERICA SEC LTR M-2015-2514767 TO MUNSCH_.DOC Secretarial Letter 5/10/2018 5/10/2018 M-2015-2514767
CSP CONTRACT MET-ED FIRSTENERGY - ORACLE AMERICA SEC LTR M-2015-2514767 TO JOHN L MUNSCH_.DOC Secretarial Letter 4/12/2018 4/12/2018 M-2015-2514767
MET ED PHASE III ACT 129 SEMI-ANNUAL REPORT PY9-1.PDF Other Miscellaneous Document 1/18/2018 M-2015-2514767
MET ED COVER LTR TO PHASE III ACT 129 SEMI-ANNUAL RPT PY 9 6/1/17-11/30/17 Other Miscellaneous Document 1/12/2018 1/18/2018 M-2015-2514767
ANNUAL REPORT ACT 129 - MET-ED Other Miscellaneous Document 11/15/2017 11/28/2017 M-2015-2514767
FIRSTENERGY OPCOS - PY8 ANNUAL REPORT-MET-ED Other Miscellaneous Document 11/28/2017 M-2015-2514767
PHASE III YEAR 8 SEMI-ANNUAL REPORT - MET ED Other Miscellaneous Document 7/12/2017 7/28/2017 M-2015-2514767
PHASE III REPORT JUN TO NOV 2016 COVER LETTER - MET ED Other Miscellaneous Document 1/16/2017 1/24/2017 M-2015-2514767
PHASE III SEMI-ANNUAL REPORT PY8-1 - MET ED Other Miscellaneous Document 1/24/2017 M-2015-2514767
CSP CONTRACT SEC LTR FIRSTENERGY - ENERGY CONNECT INC COMM AND INDUS DEMAND M-2015-2514767 TO JOHN L MUNSCH .DOCX Secretarial Letter 12/15/2016 12/15/2016 M-2015-2514767
CSP CONTRACT SEC LTR FIRSTENERGY - ENERNOC INC - COMM AND INDUS DEMAND M-2015-2514767 TO JOHN L MUNSCH .DOCX Secretarial Letter 12/15/2016 12/15/2016 M-2015-2514767
CSP CONTRACT SEC LTR FIRST ENERGY - SODEXO LETTER PO 55121999 PROGRAM INCENTIVES - M-2015-2514767 TO JOHN L MUNSCH .DOCX Secretarial Letter 6/10/2016 6/10/2016 M-2015-2514767
CSP CONTRACT SEC LTR FIRSTENERGY - SODEXO OPERATIONS LLC - PO 55121998 PROGRAM MGT - M-2015-2514767 TO JOHN L MUNSCH .DOCX Secretarial Letter 6/10/2016 6/10/2016 M-2015-2514767
CSP CONTRACT MODIFICATIONS WITH SODEXO - MET ED Other Miscellaneous Document 6/7/2016 6/10/2016 M-2015-2514767
CSP CONTRACT SEC LTR FIRSTENERGY - HONEYWELL SMART GRID SOLUTIONS - INCENTIVES PO 55122009 - M-2015-2514767 TO JOHN L MUNSCH .DOCX Secretarial Letter 6/2/2016 6/2/2016 M-2015-2514767
CSP CONTRACT SEC LTR FIRSTENERGY - HONEYWELL SMART GRID PROG MGT - PO 55122008 - M-2015-2514767 TO JOHN L MUNSCH .DOCX Secretarial Letter 6/2/2016 6/2/2016 M-2015-2514767
CSP CONTRACT SEC LTR FIRSTENERGY - POWER DIRECT MARKETING M-2015-2514767 TO JOHN L MUNSCH .DOCX Secretarial Letter 6/1/2016 6/1/2016 M-2015-2514767
CSP CONTRACT SEC LTR FIRSTENERGY - PERFORMANCE SYSTEMS DEVELOPMENT OF NY LLC NEW HOMES PROGRAM M-2015-2514767 TO JOHN L MUNSCH .DOCX Secretarial Letter 6/1/2016 6/1/2016 M-2015-2514767
CSP CONTRACT SEC LTR FIRSTENERGY - ENERTOUCH INC DBA GOOD CENTS SOLUTIONS- INCENTIVES M-2015-2514767 TO JOHN L MUNSCH .DOCX Secretarial Letter 5/19/2016 5/19/2016 M-2015-2514767
CSP CONTRACT SEC LTR FIRSTENERGY - ENERTOUCH INC DBA GOOD CENTS SOLUTIONS- PROGRAM MGT M-2015-2514767 TO JOHN L MUNSCH .DOCX Secretarial Letter 5/19/2016 5/19/2016 M-2015-2514767
CSP CONTRACT SEC LTR FIRST ENERGY - AM CONSERVATION GROUP M-2015-2514767 TO JOHN L MUNSCH .DOC Secretarial Letter 5/18/2016 5/18/2016 M-2015-2514767
CSP CONTRACT SEC LTR FIRST ENERGY - OPOWER INC M-2015-2514767 TO JOHN L MUNSCH .DOC Secretarial Letter 5/18/2016 5/18/2016 M-2015-2514767
CSP CONTRACT SEC LTR FIRST ENERGY - ARCA RECYCLING M-2015-2514767 TO JOHN L MUNSCH .DOC Secretarial Letter 5/18/2016 5/18/2016 M-2015-2514767
EE&C PHASE III TARIFF APPROVAL FIRST ENERGY.DOCX Secretarial Letter 5/12/2016 5/12/2016 M-2015-2514767
ANNUAL EE&C PHASE III RATE ADJ; SUPP #20 TO TRF #52; EFF: 6/1/16 - METED Adjustment Clause Rate Adjustments 5/2/2016 5/11/2016 M-2015-2514767
MET ED ET AL ORIGINAL SIGNATURE REQUEST LTR Secretarial Letter 4/20/2016 M-2015-2514767
CSP SEC LTR TO FIRST ENERGY - ARCA RECYCLING TO JOHN MUNSCH M-2015-2514767 .DOC Secretarial Letter 4/15/2016 4/15/2016 M-2015-2514767
LTR ADV WILL NOT BE WITHDRAWING FROM JNT PET FOR FULL SETTLMT - ENERNOC Letter 3/23/2016 3/29/2016 M-2015-2514767
LETTER/NOT WITHDRAWING FROM JOINT PETITION FOR FULL SETTLEMENT - ENERNOC Letter 3/21/2016 3/22/2016 M-2015-2514767
LETTER RE NOT WITHDRAWING FROM SETTLEMENT - INDUSTRIAL CUSTOMER GROUPS Letter 3/16/2016 3/17/2016 M-2015-2514767
LETTER RE NOT WITHDRAWING FROM SETTLEMENT - OCA Letter 3/16/2016 3/17/2016 M-2015-2514767
LETTER RE NOT WITHDRAWING FROM SETTLEMENT - CAUSE-PA Letter 3/16/2016 3/17/2016 M-2015-2514767
COMMUNICATION-LETTER.PDF Letter 3/16/2016 3/16/2016 M-2015-2514767
LETTER - MET-ED, PENELEC, PENN POWER & WEST PENN POWER NOT WITHDRAWING FROM SETTLEMENT Letter 3/16/2016 3/16/2016 M-2015-2514767
PRAECIPE TO WITHDRAW APPEARANCE-ENERNOC INC Petition to Withdraw 3/11/2016 3/11/2016 M-2015-2514767
OPINION AND ORDER - 2514767 - OSA - 3-10-16 PM - FIRSTENERGY PHASE III EEC PLAN Order 3/10/2016 3/10/2016 M-2015-2514767
CSP CONTRACT FIRSTENERGY - APPLIED ENERGY GROUP SEC LTR M-2015-2514767 TO JOHN L MUNSCH .DOC Secretarial Letter 2/18/2016 2/18/2016 M-2015-2514767
SETTLEMENT AGREEMENT - FIRST ENERGY COMPANIES Settlement Agreement 2/10/2016 2/12/2016 M-2015-2514767
M-2015-2514767 ET AL FE EEC PHASE III CERTIFICATION ORDER.DOCX Interim Order 2/12/2016 M-2015-2514767
LETTER RE JOINT SETTLEMENT - PSU Letter 2/10/2016 2/11/2016 M-2015-2514767
COVER LTR & CERT OF SVC TO PRESERVED TESIMONY OF MITCHELL MILLER - CAUSE-PA Letter 1/27/2016 1/27/2016 M-2015-2514767
CERTIFICATE OF SERVICE-MET ED ET AL Certificate of Service 1/22/2016 1/22/2016 M-2015-2514767
CERTIFICATE OF SERVICE-MET ED ET AL Certificate of Service 1/22/2016 1/22/2016 M-2015-2514767
LETTER ADVISE NOT SUBMIT REBUTTAL TESTIMONY-WAL-MART & SAM'S Letter 1/22/2016 1/22/2016 M-2015-2514767
M-2015-2514767 ET AL ORDER SUSPENDING PROCEDURAL SCHEDULE IN FIRST ENERGY PHASE III EEC.DOCX Interim Order 1/22/2016 M-2015-2514767
CERT OF SVC OF INTERROGS SET #II - CAUSE-PA Certificate of Service 1/21/2016 1/21/2016 M-2015-2514767
CERT OF SRVC INTERROG TO OCA - MET ED Certificate of Service 1/14/2016 1/19/2016 M-2015-2514767
M-2015-2514767 ET AL INITIAL HEARING.DOC Hearing Notice 1/19/2016 M-2015-2514767
LETTER ADV NOT FILING DIRECT TESTIMONY - PSU Letter 1/12/2016 1/12/2016 M-2015-2514767
LETTER ADV NOT FILING DIRECT TESTIMONY - WALMART Letter 1/12/2016 1/12/2016 M-2015-2514767
LETTER ADV NOT FILING DIRECT TESTIMONY - OSBA Letter 1/12/2016 1/12/2016 M-2015-2514767
LETTER ADV NOT SUBMITTING DIRECT TESIMONY - INDUSTRIAL CUSTOMER GROUPS Letter 1/12/2016 1/12/2016 M-2015-2514767
M-2015-2514767 ORDER GRANTING PET TO INTERVENE.DOCX Interim Order 1/12/2016 M-2015-2514767
REVISED EXHIBIT - MET ED Transcript Exhibit 1/6/2016 1/12/2016 M-2015-2514767
CERT OF SVC OF STMT #1 DIR TESTIMONY OF MITCHELL MILLER - CAUSE-PA Certificate of Service 1/12/2016 1/12/2016 M-2015-2514767
CERT OF SVC OF DIR TEST OF GEOFFREY CRANDALL OCA STMT #1 & ROGER COLTON OCA STMT #2 - OCA Certificate of Service 1/12/2016 1/12/2016 M-2015-2514767
M-2015-2514767 SCHEDULING ORDER FIRST ENERGY PHASE III EEC.DOCX Interim Order 1/11/2016 M-2015-2514767
M-2015-2514767 PHASE III PROTECTIVE ORDER.DOCX Interim Order 1/11/2016 M-2015-2514767
M-2015-2514767 ET AL SCHEDULING ORDER FIRST ENERGY PHASE III EEC.DOCX PreHearing Order 1/8/2016 1/8/2016 1/8/2016 M-2015-2514767
M-2015-2514767 PHASE III PROTECTIVE ORDER.DOCX PreHearing Order 1/8/2016 1/8/2016 1/8/2016 M-2015-2514767
PREHEARING MEMORANDUM - ENERNOC Prehearing Memorandum 1/8/2016 1/8/2016 M-2015-2514767
PETITION TO INTERVENE - ENERNOC Petition to Intervene 1/8/2016 1/8/2016 M-2015-2514767
PREHEARING MEMORANDUM - CAUSE PA Prehearing Memorandum 1/6/2016 M-2015-2514767
CERT OF SRVC INTERROG III - OCA Certificate of Service 1/6/2016 1/6/2016 M-2015-2514767
COVER PAGE TO COMMENTS - PENNFUTURE ET AL Comments 1/4/2016 1/5/2016 M-2015-2514767
COMMUNICATION-COMMENTS.PDF Comments 1/4/2016 1/5/2016 M-2015-2514767
COMMENTS - MEIUG ET AL Comments 1/4/2016 1/5/2016 M-2015-2514767
COMMENTS - RESA Comments 1/4/2016 1/5/2016 M-2015-2514767
COMMENTS - OCA Comments 1/4/2016 1/5/2016 M-2015-2514767
PREHEARING MEMORANDUM - INDUSTRIAL CUSTOMER GROUPS Prehearing Memorandum 1/4/2016 1/5/2016 M-2015-2514767
JNT PETITION TO INTERVENE & ANS-MET-ED INDUSTRIAL USERS GRP ET AL Petition to Intervene 1/4/2016 1/5/2016 M-2015-2514767
COMMENTS - ENERGYHUB Comments 1/4/2016 1/5/2016 M-2015-2514767
COMMENTS - EEFA Comments 1/4/2016 1/5/2016 M-2015-2514767
PETITION TO INTERVENE - RESA Petition to Intervene 1/4/2016 1/4/2016 M-2015-2514767
ANSWER TO PETITION - OSBA Answer to Petition 1/4/2016 1/4/2016 M-2015-2514767
PREHEARING MEMORANDUM - WAL-MART EAST & SAM'S EAST Prehearing Memorandum 12/30/2015 12/31/2015 M-2015-2514767
PETITION TO INTERVENE - WAL-MART EAST & SAM'S EAST Petition to Intervene 12/30/2015 12/31/2015 M-2015-2514767
CAUSE-PA’S - LETTER IN LIEU OF COMMENTS Letter 12/30/2015 12/30/2015 M-2015-2514767
PETITION TO INTERVENE - PENNSYLVANIA STATE UNIVER. Petition to Intervene 12/30/2015 12/30/2015 M-2015-2514767
PENNSYLVANIA STATE UNIVERSITY -PREHEARING MEMORANDUM.PDF Prehearing Memorandum 12/30/2015 12/30/2015 M-2015-2514767
OCA - PREHEARING MEMORANDUM Prehearing Memorandum 12/30/2015 12/30/2015 M-2015-2514767
PREHEARING MEMORANDUM-MET ED ET AL Prehearing Memorandum 12/29/2015 12/29/2015 M-2015-2514767
JOINT PETITION FOR A PROTECTIVE ORDER-MET ED ET AL Petition for Existing Case 12/29/2015 12/29/2015 M-2015-2514767
M-2015-2514767 ET AL PREHEARING CONFERENCE ORDER (FE EEC PHASE III).DOCX PreHearing Order 12/24/2015 M-2015-2514767
PREHEARING MEMORANDUM - OSBA Prehearing Memorandum 12/23/2015 12/23/2015 M-2015-2514767
NOTICE OF INTERVENTION - OSBA Notice of Intervention 12/18/2015 12/18/2015 M-2015-2514767
NOTICE OF APPEARANCE - TRISCARI/OSBA Notice of Appearance 12/18/2015 12/18/2015 M-2015-2514767
CERT OF SRVC INTERROG SET I - OCA Certificate of Service 12/18/2015 12/18/2015 M-2015-2514767
PETITION TO INTERVENE - CAUSE PA Petition to Intervene 12/17/2015 12/17/2015 M-2015-2514767
NOTICE OF INTERVENTION - OCA Notice of Intervention 12/10/2015 12/10/2015 M-2015-2514767
M-2015-2514767 ET AL INITIAL PREHEARING CONFERENCE.DOCX Hearing Notice 12/9/2015 M-2015-2514767
EE&C PHASE III PUBLICATION NOTICE.DOC Secretarial Letter 12/2/2015 M-2015-2514767
MET-ED PHASE III PLAN W APPENDICES COMBINED.PDF Other Miscellaneous Document 11/25/2015 M-2015-2514767
MET-ED PHASE III JT PETITION 11.23.15.PDF Other Miscellaneous Document 11/25/2015 M-2015-2514767
MET-ED PHASE III MILLER TESTIMONY FINAL 11.20.15.PDF Other Miscellaneous Document 11/25/2015 M-2015-2514767
MET-ED PHASE III KEVIN SIEDT TESTIMONY & EXHIBITS.PDF Other Miscellaneous Document 11/25/2015 M-2015-2514767
MET-ED PHASE III DARGIE TESTIMONY FINAL 11.20.15.PDF Other Miscellaneous Document 11/25/2015 M-2015-2514767
OTHER MISCELLANEOUS DOCUMENT Other Miscellaneous Document 11/23/2015 11/25/2015 M-2015-2514767

 

Need More Help?

If you can't find what you're looking for here, please contact the PA Public Utility Commission. Call us at 1-800-692-7380 or contact us online.

Document Search

Public utility documents available electronically include case dockets, public meeting orders and more.

Filing & Resources

Find utility-related reports, laws and regulations, federal filings, tariffs, procedures and more.

eFILING

Consumers, utilities and attorneys can save time by submitting documents to the PUC electronically.